#165217: "We need something more to prevent mistakes when laying out tracks"
ما هو هذا التقرير؟
ماذا حدث؟ يرجى اختيار من أدناه
ماذا حدث؟ يرجى اختيار من أدناه
يرجى التحقق مما إذا كان هناك بالفعل تقرير عن نفس الموضوع
إذا كانت الإجابة بنعم ، يرجى التصويت لهذا التقرير. يتم إعطاء التقارير ذات أكبر عدد من الأصوات الأولوية!
| # | Status | Votes | Game | Type | Title | Last update |
|---|
وصف مفصل
-
• يرجى نسخ / لصق رسالة الخطأ التي تراها على الشاشة ، إن وجدت.
This is somewhat related to boardgamearena.com/bug?id=50160 and boardgamearena.com/bug?id=69229
Even with confirmation activated, it is easy to make a mistake when laying out tracks and that will very often be game breaking.
I see multiple ways to improve this here are the ones I prefer:
1) Change how the confirmation works : make the confirmation (when the option is activated) be for the entire turn and have it be in the status bar. ( so that no part of the map is covered by a popup and also because people tend to automatically click confirm on popups )
2) If you lay a track that seems "weird", add an extra confirmation step with a message. 'Weird' would be any of the following:
- a) a track that is not connected to any city or previously placed track (yes, you do that willingly sometimes, but not often)
- b) a track next to a city where one end is dangling and the other is not connected to the city (yes, you do that willingly sometimes but not often)
- c) a track where one end leads to a mountain or outside of the map
- d) a track where on end leads to a tile where there is a track but without the 2 actually connecting
I think the best option is 1 because 2 does not cover every single possible missclick and requires more texts.
Option 1 might be more complex technically, I don't know. As the idea would be to also undo changes of dice (using special card 5 or card 1) double actions (using card 2) etc... and return everything to the state at the start of your turn
Option 1 can be reduced to just canceling the lay of the track / last part of the action.
-
• يرجى توضيح ما تريد القيام به ، ماذا فعلت وما حدث
• ما هو متصفحك؟
Google Chrome v134
-
• يرجى نسخ / لصق النص المعروض باللغة الإنجليزية بدلاً من لغتك. إذا كان لديك لقطة شاشة لهذا الخطأ (ممارسة جيدة) ، يمكنك استخدام Imgur.com لتحميله ونسخ / لصق الرابط هنا.
This is somewhat related to boardgamearena.com/bug?id=50160 and boardgamearena.com/bug?id=69229
Even with confirmation activated, it is easy to make a mistake when laying out tracks and that will very often be game breaking.
I see multiple ways to improve this here are the ones I prefer:
1) Change how the confirmation works : make the confirmation (when the option is activated) be for the entire turn and have it be in the status bar. ( so that no part of the map is covered by a popup and also because people tend to automatically click confirm on popups )
2) If you lay a track that seems "weird", add an extra confirmation step with a message. 'Weird' would be any of the following:
- a) a track that is not connected to any city or previously placed track (yes, you do that willingly sometimes, but not often)
- b) a track next to a city where one end is dangling and the other is not connected to the city (yes, you do that willingly sometimes but not often)
- c) a track where one end leads to a mountain or outside of the map
- d) a track where on end leads to a tile where there is a track but without the 2 actually connecting
I think the best option is 1 because 2 does not cover every single possible missclick and requires more texts.
Option 1 might be more complex technically, I don't know. As the idea would be to also undo changes of dice (using special card 5 or card 1) double actions (using card 2) etc... and return everything to the state at the start of your turn
Option 1 can be reduced to just canceling the lay of the track / last part of the action.
-
• هل هذا النص متاح في translation system ؟ إذا كانت الإجابة بنعم ، فهل تمت ترجمتها لأكثر من 24 ساعة؟
• ما هو متصفحك؟
Google Chrome v134
-
• يرجى توضيح اقتراحك بدقة وإيجاز بحيث يكون من السهل قدر الإمكان فهم ما تعنيه.
This is somewhat related to boardgamearena.com/bug?id=50160 and boardgamearena.com/bug?id=69229
Even with confirmation activated, it is easy to make a mistake when laying out tracks and that will very often be game breaking.
I see multiple ways to improve this here are the ones I prefer:
1) Change how the confirmation works : make the confirmation (when the option is activated) be for the entire turn and have it be in the status bar. ( so that no part of the map is covered by a popup and also because people tend to automatically click confirm on popups )
2) If you lay a track that seems "weird", add an extra confirmation step with a message. 'Weird' would be any of the following:
- a) a track that is not connected to any city or previously placed track (yes, you do that willingly sometimes, but not often)
- b) a track next to a city where one end is dangling and the other is not connected to the city (yes, you do that willingly sometimes but not often)
- c) a track where one end leads to a mountain or outside of the map
- d) a track where on end leads to a tile where there is a track but without the 2 actually connecting
I think the best option is 1 because 2 does not cover every single possible missclick and requires more texts.
Option 1 might be more complex technically, I don't know. As the idea would be to also undo changes of dice (using special card 5 or card 1) double actions (using card 2) etc... and return everything to the state at the start of your turn
Option 1 can be reduced to just canceling the lay of the track / last part of the action.
• ما هو متصفحك؟
Google Chrome v134
-
• ما الذي تم عرضه على الشاشة عندما تم حظرك (شاشة فارغة؟ جزء من واجهة اللعبة؟ رسالة خطأ؟)
This is somewhat related to boardgamearena.com/bug?id=50160 and boardgamearena.com/bug?id=69229
Even with confirmation activated, it is easy to make a mistake when laying out tracks and that will very often be game breaking.
I see multiple ways to improve this here are the ones I prefer:
1) Change how the confirmation works : make the confirmation (when the option is activated) be for the entire turn and have it be in the status bar. ( so that no part of the map is covered by a popup and also because people tend to automatically click confirm on popups )
2) If you lay a track that seems "weird", add an extra confirmation step with a message. 'Weird' would be any of the following:
- a) a track that is not connected to any city or previously placed track (yes, you do that willingly sometimes, but not often)
- b) a track next to a city where one end is dangling and the other is not connected to the city (yes, you do that willingly sometimes but not often)
- c) a track where one end leads to a mountain or outside of the map
- d) a track where on end leads to a tile where there is a track but without the 2 actually connecting
I think the best option is 1 because 2 does not cover every single possible missclick and requires more texts.
Option 1 might be more complex technically, I don't know. As the idea would be to also undo changes of dice (using special card 5 or card 1) double actions (using card 2) etc... and return everything to the state at the start of your turn
Option 1 can be reduced to just canceling the lay of the track / last part of the action.
• ما هو متصفحك؟
Google Chrome v134
-
• أي جزء من القواعد تم مخالفته في تصميم التبني لدى BGA
This is somewhat related to boardgamearena.com/bug?id=50160 and boardgamearena.com/bug?id=69229
Even with confirmation activated, it is easy to make a mistake when laying out tracks and that will very often be game breaking.
I see multiple ways to improve this here are the ones I prefer:
1) Change how the confirmation works : make the confirmation (when the option is activated) be for the entire turn and have it be in the status bar. ( so that no part of the map is covered by a popup and also because people tend to automatically click confirm on popups )
2) If you lay a track that seems "weird", add an extra confirmation step with a message. 'Weird' would be any of the following:
- a) a track that is not connected to any city or previously placed track (yes, you do that willingly sometimes, but not often)
- b) a track next to a city where one end is dangling and the other is not connected to the city (yes, you do that willingly sometimes but not often)
- c) a track where one end leads to a mountain or outside of the map
- d) a track where on end leads to a tile where there is a track but without the 2 actually connecting
I think the best option is 1 because 2 does not cover every single possible missclick and requires more texts.
Option 1 might be more complex technically, I don't know. As the idea would be to also undo changes of dice (using special card 5 or card 1) double actions (using card 2) etc... and return everything to the state at the start of your turn
Option 1 can be reduced to just canceling the lay of the track / last part of the action.
-
• هل انتهاك القواعد مرئي عند إعادة اللعب؟ إذا كانت الإجابة بنعم ، فبأي رقم؟
• ما هو متصفحك؟
Google Chrome v134
-
• ما هو نشاط اللعبة الذي أردت القيام به؟
This is somewhat related to boardgamearena.com/bug?id=50160 and boardgamearena.com/bug?id=69229
Even with confirmation activated, it is easy to make a mistake when laying out tracks and that will very often be game breaking.
I see multiple ways to improve this here are the ones I prefer:
1) Change how the confirmation works : make the confirmation (when the option is activated) be for the entire turn and have it be in the status bar. ( so that no part of the map is covered by a popup and also because people tend to automatically click confirm on popups )
2) If you lay a track that seems "weird", add an extra confirmation step with a message. 'Weird' would be any of the following:
- a) a track that is not connected to any city or previously placed track (yes, you do that willingly sometimes, but not often)
- b) a track next to a city where one end is dangling and the other is not connected to the city (yes, you do that willingly sometimes but not often)
- c) a track where one end leads to a mountain or outside of the map
- d) a track where on end leads to a tile where there is a track but without the 2 actually connecting
I think the best option is 1 because 2 does not cover every single possible missclick and requires more texts.
Option 1 might be more complex technically, I don't know. As the idea would be to also undo changes of dice (using special card 5 or card 1) double actions (using card 2) etc... and return everything to the state at the start of your turn
Option 1 can be reduced to just canceling the lay of the track / last part of the action.
-
• ماذا تحاول أن تفعل لتحريك هذا العمل اللعبة؟
-
• ماذا حدث عند محاولة القيام بهذا (رسالة خطأ ، رسالة شريط حالة اللعبة ، ...)؟
• ما هو متصفحك؟
Google Chrome v134
-
• في أي خطوة من اللعبة حدثت المشكلة (ما هو تعليمة اللعبة الحالية)؟
This is somewhat related to boardgamearena.com/bug?id=50160 and boardgamearena.com/bug?id=69229
Even with confirmation activated, it is easy to make a mistake when laying out tracks and that will very often be game breaking.
I see multiple ways to improve this here are the ones I prefer:
1) Change how the confirmation works : make the confirmation (when the option is activated) be for the entire turn and have it be in the status bar. ( so that no part of the map is covered by a popup and also because people tend to automatically click confirm on popups )
2) If you lay a track that seems "weird", add an extra confirmation step with a message. 'Weird' would be any of the following:
- a) a track that is not connected to any city or previously placed track (yes, you do that willingly sometimes, but not often)
- b) a track next to a city where one end is dangling and the other is not connected to the city (yes, you do that willingly sometimes but not often)
- c) a track where one end leads to a mountain or outside of the map
- d) a track where on end leads to a tile where there is a track but without the 2 actually connecting
I think the best option is 1 because 2 does not cover every single possible missclick and requires more texts.
Option 1 might be more complex technically, I don't know. As the idea would be to also undo changes of dice (using special card 5 or card 1) double actions (using card 2) etc... and return everything to the state at the start of your turn
Option 1 can be reduced to just canceling the lay of the track / last part of the action.
-
• ماذا حدث عند محاولة إجراء هذه الحركة داخل اللعبة (رسالة خطأ ، رسالة شريط حالة اللعبة ، ...)؟
• ما هو متصفحك؟
Google Chrome v134
-
• يرجى وصف مشكلة العرض. إذا كان لديك لقطة شاشة لهذا الخطأ (ممارسة جيدة) ، يمكنك استخدام Imgur.com لتحميله ونسخ / لصق الرابط هنا.
This is somewhat related to boardgamearena.com/bug?id=50160 and boardgamearena.com/bug?id=69229
Even with confirmation activated, it is easy to make a mistake when laying out tracks and that will very often be game breaking.
I see multiple ways to improve this here are the ones I prefer:
1) Change how the confirmation works : make the confirmation (when the option is activated) be for the entire turn and have it be in the status bar. ( so that no part of the map is covered by a popup and also because people tend to automatically click confirm on popups )
2) If you lay a track that seems "weird", add an extra confirmation step with a message. 'Weird' would be any of the following:
- a) a track that is not connected to any city or previously placed track (yes, you do that willingly sometimes, but not often)
- b) a track next to a city where one end is dangling and the other is not connected to the city (yes, you do that willingly sometimes but not often)
- c) a track where one end leads to a mountain or outside of the map
- d) a track where on end leads to a tile where there is a track but without the 2 actually connecting
I think the best option is 1 because 2 does not cover every single possible missclick and requires more texts.
Option 1 might be more complex technically, I don't know. As the idea would be to also undo changes of dice (using special card 5 or card 1) double actions (using card 2) etc... and return everything to the state at the start of your turn
Option 1 can be reduced to just canceling the lay of the track / last part of the action.
• ما هو متصفحك؟
Google Chrome v134
-
• يرجى نسخ / لصق النص المعروض باللغة الإنجليزية بدلاً من لغتك. إذا كان لديك لقطة شاشة لهذا الخطأ (ممارسة جيدة) ، يمكنك استخدام Imgur.com لتحميله ونسخ / لصق الرابط هنا.
This is somewhat related to boardgamearena.com/bug?id=50160 and boardgamearena.com/bug?id=69229
Even with confirmation activated, it is easy to make a mistake when laying out tracks and that will very often be game breaking.
I see multiple ways to improve this here are the ones I prefer:
1) Change how the confirmation works : make the confirmation (when the option is activated) be for the entire turn and have it be in the status bar. ( so that no part of the map is covered by a popup and also because people tend to automatically click confirm on popups )
2) If you lay a track that seems "weird", add an extra confirmation step with a message. 'Weird' would be any of the following:
- a) a track that is not connected to any city or previously placed track (yes, you do that willingly sometimes, but not often)
- b) a track next to a city where one end is dangling and the other is not connected to the city (yes, you do that willingly sometimes but not often)
- c) a track where one end leads to a mountain or outside of the map
- d) a track where on end leads to a tile where there is a track but without the 2 actually connecting
I think the best option is 1 because 2 does not cover every single possible missclick and requires more texts.
Option 1 might be more complex technically, I don't know. As the idea would be to also undo changes of dice (using special card 5 or card 1) double actions (using card 2) etc... and return everything to the state at the start of your turn
Option 1 can be reduced to just canceling the lay of the track / last part of the action.
-
• هل هذا النص متاح في translation system ؟ إذا كانت الإجابة بنعم ، فهل تمت ترجمتها لأكثر من 24 ساعة؟
• ما هو متصفحك؟
Google Chrome v134
-
• يرجى توضيح اقتراحك بدقة وإيجاز بحيث يكون من السهل قدر الإمكان فهم ما تعنيه.
This is somewhat related to boardgamearena.com/bug?id=50160 and boardgamearena.com/bug?id=69229
Even with confirmation activated, it is easy to make a mistake when laying out tracks and that will very often be game breaking.
I see multiple ways to improve this here are the ones I prefer:
1) Change how the confirmation works : make the confirmation (when the option is activated) be for the entire turn and have it be in the status bar. ( so that no part of the map is covered by a popup and also because people tend to automatically click confirm on popups )
2) If you lay a track that seems "weird", add an extra confirmation step with a message. 'Weird' would be any of the following:
- a) a track that is not connected to any city or previously placed track (yes, you do that willingly sometimes, but not often)
- b) a track next to a city where one end is dangling and the other is not connected to the city (yes, you do that willingly sometimes but not often)
- c) a track where one end leads to a mountain or outside of the map
- d) a track where on end leads to a tile where there is a track but without the 2 actually connecting
I think the best option is 1 because 2 does not cover every single possible missclick and requires more texts.
Option 1 might be more complex technically, I don't know. As the idea would be to also undo changes of dice (using special card 5 or card 1) double actions (using card 2) etc... and return everything to the state at the start of your turn
Option 1 can be reduced to just canceling the lay of the track / last part of the action.
• ما هو متصفحك؟
Google Chrome v134
سجل التاريخ
اضف لهذا البلاغ
- تعريف طاولة/تعريف حركة
- هل حلَت F5 المشكلة؟
- هل ظهرت المشكلة عدة مرات؟ كل مرة؟ بطريقة عشوائية؟
- إذا كان لديك لقطة شاشة لهذا الخطأ (ممارسة جيدة) ، يمكنك استخدام Imgur.com لتحميله ونسخ / لصق الرابط هنا.